AIM-listed Sound Energy has finished workover operations on its TE-6 and TE-7 gas wells at the Tendrara Production Concession in Morocco, paving the way for long-term gas production, which will feed into a micro-LNG plant which is currently under construction.
Workover operations at TE-7 are complete, with the Star Valley Rig 101 demobilized and stacked on-site. The rig successfully replaced the tubing head spool and installed new tubing, with no ongoing costs for the Company.